Commercial Offices & Financial Services

Cat A and Cat B fit-out and resilient building services for occupied, business-critical floors — from flexible workspace to trading environments.

Cat A / Cat BOccupied floorsBusiness-criticalComfort coolingOut-of-hours
01 · Challenge

Fixed dates inside buildings that remain in use.

Commercial fit-out combines landlord and tenant milestones with occupied floors, shared services and business-critical operations. The services package has to protect both programme and continuity.

Trading floors and business-critical operations cannot pause for a fit-out. Milestones arrive on fixed dates, shared services stay live, and a switchover that slips lands on the business, not just the programme.

02 · Response

Coordinated from design through handover.

RMS delivers shell and core, Cat A and Cat B mechanical and public health packages with design, coordination, installation and commissioning kept within one shared delivery process.

That includes resilient and redundant systems for live trading environments, switchovers planned for zero downtime, and disruptive works phased into agreed out-of-hours windows around the occupied building.

Workspaces built to perform.

03 · Verified standards & constraints

Verified standards & constraints

VC.01
Fixed-date programmes

Landlord and tenant milestones inform package sequencing and delivery planning.

VC.02
Occupied-floor working

Working hours and switchovers are planned around the occupied building.

VC.03
Business-critical services

Interfaces, data areas and continuity requirements are confirmed and coordinated before installation.

VC.04
Existing-building coordination

Routes and plant are developed against surveyed structure and existing services using the latest point cloud technology.

05 · Start a conversation

A fit-out or floor upgrade on a fixed date?

Speak to RMS about Cat A / Cat B mechanical and public health packages for occupied, business-critical buildings.